Plura72
New member
- Joined
- Mar 25, 2025
- Messages
- 13
- Thread Author
- #1
Plura72
Plaintiff
v.
Ministry Of Construction
Defendant
COMPLAINT
I. PARTIES
1. Plura72 (Plaintiff)
2. Ministry Of Construction (Defendant)
II. FACTS 1. On April 14, 2025, Plots released, but it was just a few, in 2:00 AM
2. This made me with severe Emotional damage
III. CLAIMS FOR RELIEF
1. I am sueing for my emotional damage
2. Ministry Of Building should chosse a better timezone
3. This Bad Time and subsequent future property loss.
IV. PRAYER FOR RELIEF
The Plaintiff seeks the following from the Defendant:
1. Compensation in the amount of £5000 coins for lost inventory items.
2. The Resignation of MrFluffy2U94
Plaintiff
v.
Ministry Of Construction
Defendant
COMPLAINT
I. PARTIES
1. Plura72 (Plaintiff)
2. Ministry Of Construction (Defendant)
II. FACTS 1. On April 14, 2025, Plots released, but it was just a few, in 2:00 AM
2. This made me with severe Emotional damage
III. CLAIMS FOR RELIEF
1. I am sueing for my emotional damage
2. Ministry Of Building should chosse a better timezone
3. This Bad Time and subsequent future property loss.
IV. PRAYER FOR RELIEF
The Plaintiff seeks the following from the Defendant:
1. Compensation in the amount of £5000 coins for lost inventory items.
2. The Resignation of MrFluffy2U94